
Boeing – Addressing Critical Business Challenges
Publication Date: Feb. 1, 2007
Author: John Schneider
Description
When Boeing began designing their new 787 Dreamliner airplane, they made the decision to build it from newer plastic composites. The challenge Boeing faced was how to transition material and mechanical engineer’s competencies from metals to composites. They needed a program that would go from theoretical to real world applications by focusing on the application of learning, and they needed it in a hurry.
You must be a member and logged in to access this item. Please Log In.